Regional Digitisation Control Centre, Hong Kong

Neuron Team

October 31, 2024

Client : Electrical and Mechanical Services Department, Hong Kong Government

Location : Hong Kong

Design and deploy a centralized city monitoring platform

As an important step towards the digitalization of government  facilities,  a  Regional  Digital  Control Centre (RDCC) was launched in EMSD Headquarters in 2020 Q3. Arup has been appointed to provide the design services and digital platform development works for this RDCC.  The platform development will be based on the existing Neuron data platform architecture with customized user requirements.

  • City-wide GIS monitoring
  • Unified data platform
  • Building system monitoring
  • Performance benchmarking
  • Analytics and AI algorithm
  • Emergency response

The RDCC will serve as a centralized digital platform to supervise and monitor critical E&M equipment, thus identify and quantify the potentials of enhancing assets’ operational efficiency and environmental performance through data analytics capability. The scalability and system capacity are the most critical consideration of this platform to support over 400 government buildings and dramatically increasing IOT devices into a central data platform and provides flexible API interfaces for future data ingestion.

Case Study

We Unlock New Avenues to Impactful Improvements

Two Taikoo Place, Hong Kong

Two Taikoo Place sets new heights for sustainable digital integration through Neuron’s IoT Hub, 3D Digital Twin, AR Patrolling and ML- assisted chiller plant optimisation.

All Seasons Place, Bangkok Thailand

All Seasons Place is a mixed-use skyscraper complex in Bangkok, Thailand. Our team successfully delivered a Digital Twin solution for the building, designed to demonstrate its smart building capabilities to the management group.

Artyzen Habitat, Zhuhai China

This case study explores how the Artyzen Habitat Hengqin Zhuhai partnered with Neuron to leverage data-driven insights to optimize performance, reduce environmental impact, and enhance guest satisfaction.

Regional Digitisation Control Centre, Hong Kong

Electrical & Mechanical Services Department unlocks efficiency for over 400 government buildings with Neuron’s City-Wide GIS Monitoring and performance benchmarking.

Make data-driven decisions with Neuron

Request a 30min Video Meeting

Request a Demo