All Seasons Place, Bangkok Thailand

Neuron Marketing

30 7 月, 2025

All Seasons Place, Bangkok

Location: Bangkok Thailand
Key services provided: Digital Twin and HVAC Optimization 

About All Seasons Place

All Seasons Place is a mixed-use skyscraper complex in Bangkok, Thailand. It comprises the 210-metre (690 ft)-tall China Resources Tower (also known as the China Resources Center or CRC Tower) and four smaller buildings that surround it: two office towers (M Thai Tower and Capitol Tower), a residential condominium (All Seasons Mansion) and the Conrad Bangkok hotel. The complex is operated by All Seasons Development, a joint-venture established between Hong Kong–based China Resources and Thai real estate developer M Thai Group. CRC Tower was the fifth-tallest building in Thailand at its completion in 2002.

Digital Twin Platform - Neuron Digital

Project Overview

Our team successfully delivered a Digital Twin solution for the building, designed to demonstrate its smart building capabilities to the management group. As part of this transformation, we replaced the dated technology Building Management System (BMS) controller with a smart controller powered by the Neuron platform. This upgrade enabled intelligent HVAC optimization with a primary focus on energy efficiency, targeting 8 – 10% electricity savings in chiller operations.

Smart Controller - Neuron Digital

Scope of Work

  1. Smart Controller Deployment
    • Replaced the obsolete BMS controller with a Neuron-based edge computing device, allowing localized, on-premise control without mandatory cloud dependency.
    • The new controller embedded with CPU edging computing capabilities enables autonomous decision-making at the edge, reducing latency and enhancing reliability.
    • Retained compatibility with Neuron Cloud’s AI functionality for advanced energy-saving analytics.
  2. Energy Optimization & BMS Reactivation
    • Focused on HVAC chiller control, leveraging real-time data to automate and optimize performance.
    • Reactivated the building’s BMS functionality, ensuring seamless integration with the new controller.
  3. Overcoming Challenges
    • Language Barriers: Coordinated effectively by overcoming language barriers between Neuron project team and local execution unit, ensured smooth project execution by addressing essential technical problems.
    • Legacy System Limitations: Mitigated constraints on static temperature settings by activating the Variable Speed Drives (VSDs) to achieve higher energy efficiency.
    • Maintenance Gaps: Eliminate the need for human intervention in controller maintenance to prevent operational inefficiencies.

Outcomes & Insights

  • Achieved immediate smart building functionality post-controller replacement.
  • Validated potential for 8  10% energy savings in HVAC operations, pending further fine-tuning.
  • Terminated the dependencies on manual oversight for optimal performance, achieving air-conditioning control automation by eliminating unnecessary human intervention.

客戶案例

我們開闢新途徑,實現有影響力的改進

西部數據

Western Digital 已聘請 Arup 和 Neuron 進行 IIOT 實施,以優化冷水機組的運行和性能。

太古坊一號

電氣及機械服務部利用 Neuron 的全市 GIS 監控和性能基準測試,提高 400 多座政府建築的效率。

香港太古廣場六座

Neuron BIM 資產管理和人工智慧演算法實現了節能和預測性維護,為設施管理提供了數據驅動的洞察力,從而提高了效率。

太古坊二期

太古坊二期透過 Neuron 的物聯網中心、3D 數位孿生、AR 巡邏和機器學習輔助的冷水機組優化,為永續數位整合樹立了新的高度。

通過 Neuron 做出數據驅動型決策,
立即聯繫

預約30分鐘的線上會議

申請演示