All Seasons Place — Smart Building Digital Twin & HVAC Optimization

Lynn Wang

30 7 月, 2025

All Seasons Place, Bangkok

Location: Bangkok Thailand
Key services provided: Digital Twin and HVAC Optimization 

About All Seasons Place

All Seasons Place is a mixed-use skyscraper complex in Bangkok, Thailand. It comprises the 210-metre (690 ft)-tall China Resources Tower (also known as the China Resources Center or CRC Tower) and four smaller buildings that surround it: two office towers (M Thai Tower and Capitol Tower), a residential condominium (All Seasons Mansion) and the Conrad Bangkok hotel. The complex is operated by All Seasons Development, a joint-venture established between Hong Kong–based China Resources and Thai real estate developer M Thai Group. CRC Tower was the fifth-tallest building in Thailand at its completion in 2002.

Digital Twin Platform - Neuron Digital

Project Overview

Our team successfully delivered a Digital Twin solution for the building, designed to demonstrate its smart building capabilities to the management group. As part of this transformation, we replaced the dated technology Building Management System (BMS) controller with a smart controller powered by the Neuron platform. This upgrade enabled intelligent HVAC optimization with a primary focus on energy efficiency, targeting 8 – 10% electricity savings in chiller operations.

Smart Controller - Neuron Digital

Scope of Work

  1. Smart Controller Deployment
    • Replaced the obsolete BMS controller with a Neuron-based edge computing device, allowing localized, on-premise control without mandatory cloud dependency.
    • The new controller embedded with CPU edging computing capabilities enables autonomous decision-making at the edge, reducing latency and enhancing reliability.
    • Retained compatibility with Neuron Cloud’s AI functionality for advanced energy-saving analytics.
  2. Energy Optimization & BMS Reactivation
    • Focused on HVAC chiller control, leveraging real-time data to automate and optimize performance.
    • Reactivated the building’s BMS functionality, ensuring seamless integration with the new controller.
  3. Overcoming Challenges
    • Language Barriers: Coordinated effectively by overcoming language barriers between Neuron project team and local execution unit, ensured smooth project execution by addressing essential technical problems.
    • Legacy System Limitations: Mitigated constraints on static temperature settings by activating the Variable Speed Drives (VSDs) to achieve higher energy efficiency.
    • Maintenance Gaps: Eliminate the need for human intervention in controller maintenance to prevent operational inefficiencies.

Outcomes & Insights

  • Achieved immediate smart building functionality post-controller replacement.
  • Validated potential for 8  10% energy savings in HVAC operations, pending further fine-tuning.
  • Terminated the dependencies on manual oversight for optimal performance, achieving air-conditioning control automation by eliminating unnecessary human intervention.

项目案例

我们开辟通往深远改善的新途径

香港太古广场六座

Neuron BIM 资产管理和人工智能算法实现了节能和预测性维护,为设施管理提供了数据驱动的洞察力,从而提高了效率。

太古广场一号

One Taikoo Place 采用了奥雅纳和 Neuron 开发的创新数字平台,以提高可持续性和效率,同时通过先进的数据分析技术提供有价值的见解。

南丰启德

启德的地标性建筑通过 Neuron IoT Hub、楼宇分析、三维数字孪生和基于人工智能的暖通空调优化,率先实现了楼宇智能化。

西部数据

Western Digital 已委托奥雅纳和 Neuron 实施 IIOT 项目,以优化冷水机组的运行和性能。

通过Neuron做出数据驱动型决策

Request a 30min Video Meeting

Request a Demo